Mehdi Foumani and Kouroush Jenab
[1] M. Foumani and K. Jenab, Cycle time analysis in reentrant robotic cells with swap ability, International Journal of Production Research, 50(22), 2012, 6372–6387. [2] K. Jenab, S. Shafiei-Monfared, and K. Salehi-Gilani, Productivity analysis in a robotic cell, International Journal of Production Research, 47(23), 2009, 6651–6662. [3] M. Foumani and K. Jenab, Analysis of flexible robotic cells with improved pure cycle, International Journal of Computer Integrated Manufacturing, 26(3), 2013, 201–215. [4] S.P. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz, and W. Kubiak, Sequencing of parts and robot moves in a robotic cell, International Journal of Flexible Manufacturing Systems, 4(3–4), 1992, 331–358. [5] N. Brauner and G. Finke, Optimal moves of the material handling system in a robotic cell, International Journal of Production Economics, 74(1–3), 2001, 269–277. [6] H.N. Geismar, L.M.A. Chan, M. Dawande, and C. Sriskandarajah, Approximations to optimal k-unit cycles for single-gripper and dual-gripper robotic cells, Production and Operation Management, 17(5), 2008, 551–563. [7] M. Dawande, H.N. Geismar, S.P. Sethi, and C. Sriskandarajah, Sequencing and scheduling in robotic cells: Recent developments, Journal of Scheduling, 8(5), 2005, 387–426. [8] M. Dawande, C. Sriskandarajah, and S.P. Sethi, On throughput maximization in constant travel-time robotic cells, Manufacturing and Service Operations Management, 4(4), 2002, 296–312. [9] F. Jolai, M. Foumani, R. Tavakoli-Moghadam, and P. Fattahi, Cyclic scheduling of a robotic flexible cell with load lock and swap, Journal of Intelligent Manufacturing, 23(5), 2012, 1885–1891. [10] Y. Crama and J. Van de Klundert, Cyclic scheduling of identical parts in a robotic cell, Operations Research, 45(6), 1997, 952–965.
Important Links:
Go Back