MODELLING AND OPTIMIZATION OF A SINGLE-UNIT PLC SYSTEM

S.M. Rizwan, V. Khurana, and G. Taneja

References

  1. [1] L.R. Goel & S.Z. Mumtaz, Analysis of a two server twounit cold standby system with correlated failures and repairs, Microelectron Reliability, 34(4), 1994, 731–734. doi:10.1016/0026-2714(94)90037-X
  2. [2] M.N. Gopalan & K.S. Bhanu, Cost analysis of a two unitrepairable system subject to on line preventive maintenanceand/or repair, Microelectron Reliability, 35, 1995, 251–258. doi:10.1016/0026-2714(95)90090-D
  3. [3] M.N. Gopalan & U. Dinesh Kumar, On the transient behavior of a repairable system with a warm standby, Microelectron Reliability, 36, 1996, 525–532. doi:10.1016/0026-2714(94)00183-9
  4. [4] A. Kumar, S.K. Gupta, & G. Taneja, Comparative studyof the profit of a two server system including patience time and instruction time, Microelectron Reliability, 36(10), 1996, 1595–1601. doi:10.1016/0026-2714(95)00075-5
  5. [5] M. Jacob, S. Narmada, & T. Varghese, Analysis of two-unit deteriorating standby system with repair, Microelectron Reliability, 37(5), 1997, 857–862. doi:10.1016/S0026-2714(96)00112-6
  6. [6] W.L. Attahiru Sule Alfa & Y.Q. Zhao, Stochastic analysis of a repairable system with three units and repair facilities, Microelectron Reliability, 38(4), 1998, 585–595.
  7. [7] S.M. Rizwan & G. Taneja, Profit analysis of a system with perfect repair at partial failure or complete failure, Pure & Applied Mathematika Sciences, LII (1–2), 2000, 7–14.
  8. [8] R.C.M. Yam, M.J. Zuo, & Y.L. Zhang, A method for evaluation of reliability indices for repairable circular consecutive-k-out-of-n: F repairable system with priority in repair, International Journal of System Science, 32, 2001, 591–598.
  9. [9] G. Taneja & N. Vandana, Comparative study of two reliability models with patience time and chances of non-availability of expert repairman, Pure and Applied Mathematika Sciences, LVII, 2003, 23–35.
  10. [10] S.M. Rizwan, G. Taneja, & V. Khurana, Reliability modeling of a hot standby PLC system, Proc. ICCCP’05, Sultan Qaboos University, Oman, February 14–16, 2005, 486–489.
  11. [11] W. Kuo & M.J. Zuo, Optimal reliability modeling (Boston: John Wiley & Sons, Inc., 2003).

Important Links:

Go Back