RELIABILITY ALLOCATION OF HYDRAULIC SYSTEMS FOR COMPUTER NUMERICAL CONTROL (CNC) MACHINE TOOLS BASED ON IMPROVED FUZZY ANALYTIC HIERARCHY PROCESS (FAHP)

Jie Yu, Tiebin Wang, Xinghe Sun, Weidong Wang, and Gege Zhao

References

  1. [1] H. Zhang, M. Li, and Y. Wang, Development of an activepower filter based on sliding mode control and RBF networks,Mechatronic Systems and Control, 49(3), 2021, 149–156.
  2. [2] Y. Chen, M. Han, and J. Ye, Knowledge representationof CBR-based fault diagnosis systems for CNC equipment,Journal of Beijing University of Aeronautics and Astronautics,37(12), 2011, 1557–1561.
  3. [3] C. Liu, Y. Zhang, B. Zhang, F. Shu, X. Zhang, and T. Liu,A review of servo system fault diagnosis techniques for CNCmachine tools, Journal of Changchun University of Technology:Natural Science Edition, 34(2), 2013, 200–206.
  4. [4] J. Wang and M. Qi, Application of RBR and CBR in the faultdiagnosis system of CNC machine tools, Combined MachineTools and Automated Machining Technology, 2011(1), 2011,47–53.
  5. [5] J. Zhang, Z. Cao, H. Gong, R. Zhang, and K. Li, Discussionon the development trend of CNC machine tools andcountermeasures, Science and Technology Wind, 2019(21),2019, 180.
  6. [6] C. Zhan, Fundamentals of hydraulic reliability design and designguidelines, (Beijing: Metallurgical Industry Press, 2018).
  7. [7] J. Li, Reliability analysis of hydraulic system of CNCmachine tools based on Monte Carlo method, Hydraulics andPneumatics, 2011(11), 2011, 115–117.
  8. [8] H. Yu, G. Zhang, Y. Ran, M. Li, and Y. Wang, A comprehensiveand practical reliability allocation method considering failureeffects and reliability costs, Eksploatacja i Niezawodnosc-Maintenance and Reliability, 20(2), 2018, 244–251.
  9. [9] J. Cai, Z. Fang, and Q. Zhang, Study on the reli-ability allocation of hybrid systems considering failure-related, Systems Engineering Theory and Practice, 41(09),2021, 2404–2413.
  10. [10] W.X. Liu, Mechanical reliability, (Beijing: Tsinghua UniversityPress, 1996).
  11. [11] M. Li, Y. Tang, J. Zeng, and X. Ren, Reliability allocationfor wafer stage system of lithography based on AHP, Proc.International Conf. on Quality, Chengdu, 2012, 1081–1084.
  12. [12] W. Cai, H. Li, H. Gong, J. Tuo, C. Liu, and Y. Jiao, Evaluationmethod of smart energy meter suppliers based on hierarchicalanalysis method, Electrical Measurement and Instrumentation,56(1), 2019, 121–127.
  13. [13] H. Cai, Construction of CNC machine tools, (Beijing: BeijingInstitute of Technology Press, 2016).
  14. [14] Y. Li, X. Hu, and A. Qiao, An improved fuzzy hierarchicalanalysis method, Journal of Northwestern University (NaturalScience Edition), 35(1), 2005, 11–1.
  15. [15] K. Chen, Y. Wang, and J. Liu, Choice of cutting fluid for greenmanufacturing machine bed based on FAHP-GRA, ModularMachine Tool and Automatic Manufacturing Technique,2021(2), 2021, 140–144.
  16. [16] A. Moghaddam, M. Moghaddam, and M. Esfandyari, Stockmarket index prediction using artificial neural network, Journalof Economics, Finance and Administrative Science, 21(41),2016, 89–93.
  17. [17] J. Tang, F. Liu, and W. Zhang, Lane-changes predictionbased on adaptive fuzzy neural network, Expert Systems withApplications, 91, 2018, 452–463.
  18. [18] D. You and H. Pham, Reliability analysis of the CNCsystem based on field failure data in operating environments,Quality and Reliability Engineering International, 32(5), 2015,1955–1963.
  19. [19] C. Vishnu and V. Regikumar, Reliability based maintenancestrategy selection in process plants: A case study, ProcediaTechnology, 25, 2016, 1080–1087.
  20. [20] T. Gulavane, Reliability analysis SSN College of Engineering,Chennai, of CNC turning centre machine: A case study fromIndian industry, Proc. Third National Conf. on Reliability andSafety Engineering, Chennai, 2016.
  21. [21] R. Patil, B. Kothavale, L. Waghmode, and S. Joshi, Reliabilityanalysis of CNC turning center based on the assessment oftrends in maintenance data: A case study, International Journalof Quality and Reliability Management, 34(9), 2017, 1616–1638.
  22. [22] P. Vida, Y. Kamiar, N. Maziar, and N. Nahal, Managementof the construction and demolition waste (CDW) anddetermination of the best disposal alternative by FAHP (FuzzyAnalytic Hierarchy Process): A case study of Tehran, Iran,Journal of the Air and Waste Management Association, 73(4),2023, 11–14.6
  23. [23] L. Li, B. Guo, Z. Liu, and X. Ma, Influence of frequency conver-sion on material mass of participating in vibration in vibratingfeeder, Mechatronic Systems and Control, 48(3), 2020, 194–198.
  24. [24] B. Parul, S. Bhavna, and K. Nand, Allocating weightage tosustainability criteria’s for performance assessment of grouphousing developments: Using fuzzy analytic hierarchy process,Journal of Building Engineering, 65(1), 2023, 105684.
  25. [25] S. Mohsen, T. Salman, A. Nasrin, G. Hamedeh, A. Vahid,T. Mostafa, G. Aysa, S. Ahmad, and A. Bahare, Developmentof a novel Electrical Industry Safety Risk Index (EISRI) in theelectricity power distribution industry based on fuzzy analytichierarchy process (FAHP), Heliyon, 9(2), 2023, 13155–13155.
  26. [26] P. Aotian, Quality improvement of undergraduate coursesbased on fuzzy analytic hierarchy process and entropy method,Frontiers in Psychology, 13, 2022, 892628–892628.
  27. [27] Y. Li, Y. Yu, X. Hu, and X. Liu, Vector control of permanentmagnet synchronous linear motor based on improved BPneural network, Mechatronic Systems and Control, 49(2),2021, 109–114.
  28. [28] B. Singh, K. Dinesh, and A. Babu J, Deriving and comparingpriority vectors for revised-leachate pollution index (r-LPI)using three fuzzy analytic hierarchy process, EnvironmentalProgress and Sustainable Energy, 42(1), 2022, e13931.

Important Links:

Go Back