A PROBABILITY-BASED CONTINGENCY MANAGEMENT APPROACH USING LINE INDICES

Akanksha Mishra and Gundavarapu V. Nagesh Kumar

References

  1. [1] N. Amjady and M. Esmaili, Application of a new sensitivity analysis framework for voltage contingency ranking, IEEE Transactions on Power Systems, 20(2), 2005, 973–983.
  2. [2] V. Donde, V. L´opez, B. Lesieutre, A. Pinar, C. Yang, and J. Meza, Severe multiple contingency screening in electric power systems, IEEE Transactions on Power Systems, 23(2), 2008, 406–417.
  3. [3] B. Suthar and R. Balasubramanian, A new approach to real time line outage contingency analysis for voltage secure operation of power systems, Joint international conference on power system technology and IEEE Power India Conference, 2008, POWERCON 2008, 12–15 Oct. 2008, New Delhi, 1–8.
  4. [4] M. Abedi, M. Ehsan, Z.G. Jahromi, and M.M. Jamei, Uti-lization of analytical hierarchy process in contingency ranking, Power Systems Conference and Exposition, 2009. PSCE’09. IEEE/PES, Seattle, WA, 2009, 1–6.
  5. [5] V. Krishnan, and J.D. McCalley, Contingency assessmentunder uncertainty for voltage collapse and its application in risk based contingency ranking, Electrical Power and Energy Systems, 43, 2012, 1025–1033.
  6. [6] H. Chiang and W. Lei, Toward real-time detection of critical contingency of large power systems, IEEE Power and Energy Society General Meeting, Vancouver, BC, 2013, 1–5.
  7. [7] C. Singh, X. Luo, and H. Kim, Power system adequacy andsecurity calculations using Monte Carlo simulation incorpo-rating intelligent system methodology, Int. Conf. Probabilistic Methods Applied to Power Systems, PMAPS 2006, Stockholm, 2006, 1–9.
  8. [8] M.F. Zambroni de Souza, Y. Reis, A.B. Almeida, I. Lima,and A.C. Zambroni de Souza, Load margin assessment ofsystems with distributed generation with the help of a neuro-fuzzy method, IET Renewable Power Generation, 9(4), 2015, 331–339.
  9. [9] A.B. Rodrigues, R.B. Prada, and M.G. da Silva, Voltage stability probabilistic assessment in composite systems: Modeling unsolvability and controllability loss, IEEE Transactions on Power Systems, 25, 2010, 1575–1588.
  10. [10] K. Visakha, D. Thukaram, and L. Jenkins, Application of UPFC for system security improvement under normal andnetwork contingencies, Electric Power Systems Research, 70,2004, 46–55.
  11. [11] V. Jayasankara, N.Kamaraj, and N.Vanaja, Estimation of voltage stability index for power system employing artificial neural network technique and TCSC placement, Neurocomputing, 73, 2010, 3005–3011.
  12. [12] H.I. Shaheen, G.I. Rashed, and S.J. Cheng, Application and comparison of computational intelligence techniques for optimal location and parameter setting of UPFC, Engineering Applications of Artificial Intelligence, 23, 2010, 203–216.
  13. [13] N.P. Padhy and A.M.M. Abdel-Rahim, Optimal placement of facts devices for practical utilities, International Journal of Power and Energy Systems, 27(2), 2007.
  14. [14] M. Moudjahed and M. Boudiaf, Optimal power flow by IPFCusing fuzzy logic controller, International Journal of Power and Energy Systems, 34(2), 2014.
  15. [15] A.A.Cuello-Reyna and J.R. Cede˜no-Maldonado (Puerto Rico), OPF framework for congestion management in deregulated environments using differential evolution, Int. Conf. Power and Energy Systems, PES, October 24–26, 2005, Marina del Rey, USA.
  16. [16] M. Wolter and L. Hofman, Allocation of responsibility for congestions in transmission systems based on power flow decomposition, Int. Conf. Power and Energy Systems (AsiaPES2010), Phuket, Thailand, November 24–26, 2010.
  17. [17] V. Rajendran and S. Mahalingam, Optimal allocation and sizing of FACTS controllers using differential evolution algorithm, Control and Intelligent Systems, 41 (3), 2013, 136–142.
  18. [18] G. Granelli, P. Marannino, M. Montagna, and M. InnortaCongestion management and loop flow control by transmissionnetwork reconfiguration, International Journal of Power andEnergy Systems, 30(3), 2010, 183.
  19. [19] N.G. Hingorani and L. Gyugyi, Understanding FACTS: Concepts and technology of flexible AC transmission system (IEEE Press, 2000).
  20. [20] A. Mishra and V.N.K. Gundavarapu, Line utilization factor based optimal allocation of IPFC and sizing using fire-fly algorithm for congestion management, IET Generation,Transmission and Distribution, October 2015, 1–8.

Important Links:

Go Back