SCHEDULING OF HEAD-SENSITIVE CASCADED HYDRO SYSTEMS: A COMPARISON BASED ON NUMERICAL SIMULATION RESULTS

J.P.S. Catal˜o, S.J.P.S. Mariano, V.M.F. Mendes, and L.A.F.M. Ferreira a

References

  1. [1] V.M.F. Mendes, L.A.F.M. Ferreira, & S.J.P.S. Mariano, Short-term hydro schedule with head-dependent approach by anonlinear model, Proc. 8th Portuguese-Spanish Congress onElectrical Engineering, Vilamoura, Portugal, 2003, 69–74.
  2. [2] J.P.S. Catal˜ao, S.J.P.S. Mariano, V.M.F. Mendes, & L.A.F.M.Ferreira, Short-term hydro scheduling: A comparison of linearwith non-linear network mathematical programming, Proc. 3rdIASTED Int. Conf. on Power and Energy Systems, Marbella,Spain, 2003, 441–445.
  3. [3] J.P.S. Catal˜ao, Short-term operational planning of hydroelec-tric power systems (in Portuguese), master thesis, InstitutoSuperior T´ecnico, Technical University of Lisbon, Portugal,2003.
  4. [4] L.A.F.M. Ferreira, T. Andersson, C.F. Imparato, T.E. Miller,C.K. Pang, A. Svoboda, & A.F. Vojdani, Short-term resourcescheduling in multi-area hydrothermal power systems, Inter-national Journal of Electrical Power & Energy Systems, 11 (3),1989, 200–212. doi:10.1016/0142-0615(89)90029-X
  5. [5] X. Guan, E. Ni, R. Li, & P.B. Luh, An optimisation-basedalgorithm for scheduling hydrothermal power systems withcascaded reservoirs and discrete hydro constraints, IEEE Trans.on Power Systems, 12 (4), 1997, 1775–1780. doi:10.1109/59.627890
  6. [6] C. Lyra & L.R.M. Ferreira, A multiobjective approach to theshort-term scheduling of a hydroelectric power system, IEEETrans. on Power Systems, 10 (4), 1995, 1750–1755. doi:10.1109/59.476038
  7. [7] S.M. Amado & C.C. Ribeiro, Short-term generation schedulingof hydraulic multi-reservoir multi-area interconnected systems,IEEE Trans. on Power Systems, PWRS-2 (3), 1987, 758–763.
  8. [8] A.J. Wood & B.F. Wollenberg, Power generation, operationand control (New York: John Wiley & Sons, 1996).
  9. [9] A.I. Cohen & V.R. Sherkat, Optimization-based methods foroperations scheduling, Proc. IEEE, 75(12), 1987, 1574–1591.
  10. [10] C.-A. Li, E. Hsu, A.J. Svoboda, C.-L. Tseng, & R.B. Johnson,Hydro unit commitment in hydro-thermal optimization, IEEETrans. on Power Systems, 12 (2), 1997, 764–769. doi:10.1109/59.589675
  11. [11] M. Piekutowski, T. Litwinowicz, & R.J. Frowd, Optimal short-term scheduling for a large-scale cascaded hydro system, IEEETrans. on Power Systems, 9(2), 1994, 805–811. doi:10.1109/59.317636
  12. [12] A.J. Conejo, J.M. Arroyo, J. Contreras, & F.A. Villamor,Self-scheduling of a hydro producer in a pool-based electricitymarket, IEEE Trans. on Power Systems, 17 (4), 2002, 1265–1272. doi:10.1109/TPWRS.2002.804951
  13. [13] G.W. Chang, M. Aganagic, J.G. Waight, J. Medina, T. Burton,S. Reeves, & M. Christoforidis, Experiences with mixed integerlinear programming based approaches on short-term hydroscheduling, IEEE Trans. on Power Systems, 16 (4), 2001,743–749. doi:10.1109/59.962421
  14. [14] J. Garc´ıa-Gonz´alez, E. Parrilla, J. Barqu´ın, J. Alonso, A. S´aiz-Chicharro, & A. Gonz´alez, Under-relaxed iterative procedurefor feasible short-term scheduling of a hydro chain, Proc. IEEEPower Tech 2003 Conf., Bologna, Italy, 2003.
  15. [15] O. Nilsson & D. Sjelvgren, Mixed-integer programming appliedto short-term planning of a hydro-thermal system, IEEE Trans.on Power Systems, 11(1), 1996, 281–286. doi:10.1109/59.486107
  16. [16] X. Guan, A. Svoboda, & C.-A. Li, Scheduling hydro powersystems with restricted operating zones and discharge rampingconstraints, IEEE Trans. on Power Systems, 14(1), 1999,126–131. doi:10.1109/59.744500
  17. [17] E. Ni, X. Guan, & R. Li, Scheduling hydrothermal powersystems with cascaded and head-dependent reservoirs, IEEETrans. on Power Systems, 14(3), 1999, 1127–1132. doi:10.1109/59.780941

Important Links:

Go Back