S.M.H. Hosseini, F. Forouzbakhsh, and M. Fotuhi-Firuzabad
[1] Energy Ministry of China, Hydro power plant hand book Chinesestandard, 1990, 180–185. [2] S.M.H. Hosseini, F. Forouzbakhsh, & M. Vakilian, Economicalanalysis of financing on medium and small hydro power plants,21Int. Conf. on Hydropower and Dams, Villach, Austria, October,2005, 17–20. [3] Energy Ministry of Iran, Iran Water and Power ResourcesDevelopment Co. (IWPCO), Economic Regulation of SmallHydro-power Plants, Small and Medium Sized Power PlantsDepartment (2003). [4] S.M.H. Hosseini, F. Forouzbakhsh, & M. Vakilian, An approachto the investment analysis of small and medium hydro-powerplants, Elsevier Energy Policy Journal, 35(2), 2007, 1013–1024. [5] Department of the Army, US Army Crops Engineering, Wash-ington, DC, Engineering and Design Hydropower (Handbook,Vol. II, Chapter 8, 1985), 1–26. [6] International Atomic Energy Agency, Expansion Planning forElectrical Generating Systems (Vienna: Guide Book, 1984),155–171. [7] R. Billinton & R. Allan, Reliability evaluation of power systems,Second Edition, Chapter 12, Plenum Press, USA, 1996, 400–440. [8] R. Billinton & R. Allan, Reliability evaluation of engineeringsystems, Second Edition, Chapter 13, Plenum Press, USA,1987, 372–400. [9] IEEE, IEEE Recommended practice for design reliable in-dustrial and commercial power systems (USA: Guide Book,1985). [10] Energy Ministry of Iran, Iran Water and Power ResourcesDevelopment Co. (IWPCO), Medium and small-size powerplants (Report of Second Phase of Bookan Power Plant, 2002).
Important Links:
Go Back