MULTILEVEL CONTROLLER FOR LINEAR INTERCONNECTED DYNAMICAL SYSTEMS WITH CONSTRAINTS

M.F. Hassan

References

  1. [1] M.S. Mahmoud, M.F. Hassan, & M.G. Darwish, Large scalecontrol systems: Theories and techniques (New York: MarcelDekker Inc., 1985).
  2. [2] M.G. Singh, Decentralized control (Amsterdam: North-Holland, 1981).
  3. [3] D.D. Siljak, Large scale dynamical systems: Stability andstructure (Amsterdam: North-Holland, 1978).
  4. [4] D.D. Siljak & M.K. Sundareshan, A multilevel optimization oflarge scale dynamic systems, IEEE Transactions on AutomaticControl, AC-21, 1976, 79–84. doi:10.1109/TAC.1976.1101141
  5. [5] E.F. Mulder, M.V. Kothare, & M. Morari, Multi-variableanti-windup controller synthesis using iterative linear matrixinequality, Proc. European Control Conf., Karsruhe, Germany,1999.
  6. [6] A. Teel & N. Kapoor, The L2 anti-windup problem: Itsdefinition and solution, Proc. European Control Conf., Brussels,Belgium, 1997.
  7. [7] A. Bemporad, M. Morari, V. Dua, & E.N. Pistikopoulous,The explicit linear quadratic regulator for constrained systems,Automatica, 38, 2002, 3–20. doi:10.1016/S0005-1098(01)00174-1
  8. [8] A. Bemporad, F. Borrelli, & M. Morari, The explicit solutionof constrained LP-based receding horizon control, Proc. 39thIEEE Conf. on Decision and Control, Sydney, Australia, 2000.
  9. [9] M.F. Hassan, Solution of linear quadratic constraint problemvia coordinating approach, International Journal of InnovativeComputing, Information and Control, 2 (3), 2006, 527–542.
  10. [10] M.F. Hassan & N.B. Almutairi, New algorithm for complexoptimization problem with inequality constraints, Journal ofAutosoft Intelligent Automation and Soft Computing, 11, 2005,1–31.
  11. [11] M.F. Hassan, Large scale discrete LQP with system con-straints, ICGST International Journal on Automatic Controland System Engineering (ACSE), 5(4), 2005, 13–26.
  12. [12] M.F. Hassan, A developed algorithm for solving constrained lin-ear quadratic problems with time delays, 4th WSEAS/IASMEInt. Conf. on System Science and Simulation Engineering,Tenerife, Canary, Island, Spain, December 16–18, 2005, 71–76.
  13. [13] M.F. Hassan, Convergence analysis of a coordinating approachfor solving constrained linear quadratic problems with timedelay, WSEAS Transactions on Systems, 5(3), 2006, 450–457.
  14. [14] D.E. Kirk, Optimal control theory: An introduction (EnglewoodCliffs, NJ: Prentice Hall, 1970).

Important Links:

Go Back