HARNESSING UNTAPPED HYDROPOWER

T.J. Hammons

References

  1. [1] Winnipeg Free Press magazine, May 6, 2001, p. B1; Insights, Manitoba Hydro, 10(1), May 2000.
  2. [2] Working with Aboriginal Groups, Hydro Lines, 40(3), June 2000. 11
  3. [3] J.B. Thorsteinsson, Winnipeg Hydro’s innovative hydraulic turbine technology, The Keystone Professional (Association of Professional Engineers and Geoscientists of the Province of Manitoba), August 2000.
  4. [4] China’s construction in four decades, Coastal International Consultant Co., Ltd., and Information Institute of Water Resources and Electric Power, Ministry of Energy of the People’s Republic of China (MOE), Ministry of Water Resources of the People’s Republic of China (MWR), 1989.
  5. [5] P.C.S. Krishnaya et al., An evaluation of the R & D requirements for developing HVDC converter stations for voltages above ±600 kV, 1988 Session of CIGRE, 28 August–3 September, Paris, paper 14-07.
  6. [6] A. Clerici & G. Valtorta, Long distance transmission of bulk power: The EHV-UHVDC Challenge, Asea Brown Boveri Group (ABB) STE, Italy, 1994.
  7. [7] Working Group 38.04, Ultra high voltage technology, 1994 Session of CIGRE, 28 August–3 September, Paris, paper 37/38-01.
  8. [8] Y. Yamagata et al., Development of 1100 kV GIS-gas circuit breaker, disconnectors and high-speed grounding switches, 1996 Session of CIGRE, 26–29 August, Paris, paper 13-304.