OBJECT-ORIENTED MULTI-INDENTURE MULTI-ECHELON SPARE PARTS SUPPLY CHAIN SIMULATION MODEL

M.D. Rossetti and S. Thomas

References

  1. [1] A.V. Sleptchenko, Integral inventory control in spare partsnetworks with capacity restrictions, doctoral diss., UniversiteitTwente, The Netherlands, 2002.
  2. [2] C. Sherbrooke, Optimal inventory modeling of systems: Multi-echelon techniques (New York: Wiley, 1992).
  3. [3] I.R. Hester, Analysis of the effect of centralizing managementof mobility readiness spares package assets, masters thesis, AirForce Institute of Technology, Dayton, Ohio, 2001.368
  4. [4] G.C. Schaefer & J.D. Haas, A simulation model to investigatethe impact of health and usage monitoring systems (HUMS)in helicopter operations and maintenance, Proc. America Helicopter Society 58th Annual Forum, Montreal, 2002.
  5. [5] M. Cohen, P.V. Kamesam, P. Kleindorfer, H. Lee, & A. Tekrian,Optimizer: IBM’s multi-echelon inventory system for managingservice logistics, Interfaces, 20 (1), 1990, 65–82.
  6. [6] A.M. Law & W.D. Kelton, Simulation modeling and analysis(Boston: McGraw-Hill, 2000).
  7. [7] M. Dong, Process modeling, performance analysis and configuration simulation in integrated supply chain network design, doctoral diss., Virginia Polytechnic Institute and StateUniversity, 2001.
  8. [8] R.G. Ingalls, The value of simulation in modeling supplychains, Proc. Winter Simulation Conf., D.J. Medetros, E.F.Watson, J.S. Carson, & M.S. Manivannan (Eds.), Washington,DC, 1998, 1371–1375. Institute of Electrical and ElectronicEngineers, Piscataway, New Jersey. doi:10.1109/WSC.1998.746004
  9. [9] M.D. Rossetti & H.T. Chan, A prototype object-orientedsupply chain simulation framework, Proc. Winter SimulationConf., S. Chick, P.J. Sanchez, D. Ferrin, & D.J. Morrice(Eds.), New Orleans, Louisiana, 2003, 1612–1620. Institute ofElectrical and Electronic Engineers, Piscataway, New Jersey. doi:10.1109/WSC.2003.1261610
  10. [10] J.M. Swaminathan, S.F. Smith, & N.M. Sadeh, Modelingsupply chain dynamics: A multiagent approach, DecisionSciences, 29 (3), 1998, 607. doi:10.1111/j.1540-5915.1998.tb01356.x
  11. [11] W.J. Hopp & M.L. Spearman, Factory physics: Foundationsof manufacturing management (Boston: Irwin/McGraw-Hill,2000).
  12. [12] L. Silverston, The data model resource book (New York: Wiley,2001).
  13. [13] J. Jiao, M.M. Tseng, Q. Ma, & Y. Zou, Generic bill-of-materials-and-operations for high-variety production management, Concurrent Engineering Research and Applications,8 (4), 2000, 297–321. doi:10.1106/95P6-GB09-YHG6-H5QG
  14. [14] M.D. Rossetti, B. Aylor, R. Jacoby, A. Prorock, & A.White,Simfone: An object-oriented simulation framework, Proc. Winter Simulation Conf., J. Joines, R. Barton, P. Fishwick, &K. Kang (Eds.), Orlando, FL, 2000, 1855–1864. Institute ofElectrical and Electronic Engineers, Piscataway, New Jersey. doi:10.1109/WSC.2000.899179
  15. [15] E. Gamma, R. Helm, R. Johnson, & J. Vlissides, Design patterns: Elements of reusable object-oriented software (Reading,MA: Addison-Wesley, 1995).

Important Links:

Go Back