Effects of Normal Weather Conditions on Interruptions in Distribution Systems

A. Domijan, Jr., R.K. Matavalam, A. Montenegro, W.S. Wilcox, Y.S. Joo, L. Delforn, J.R. Diaz, L. Davis, J. D'Agostini

References

  1. [1] 2001 cost of downtime, Contingency Planning Research (CPR)and Contingency Planning & Management Magazine (CPM).
  2. [2] T.E. Grebe, D.D. Sabin, & M.F. McGranaghan, An assessmentof distribution system power quality, Volume 1: Executivesummary, EPRI Report TR-106294-V1, Palo Alto, CA, May 1996.
  3. [3] D.D. Sabin, An assessment of distribution system power quality,Volume 2: Statistical summary report, EPRI Report TR-106294-V2, Palo Alto, CA, May 1996.
  4. [4] D.L. Brooks & D.D. Sabin, An assessment of distributionsystem power quality, Volume 3: The library of distributionsystem power quality monitoring case studies, EPRI ReportTR-106294-V3, Palo Alto, CA, May 1996.
  5. [5] Transmission line reference book, 345kV and above, 2nd ed.,Electric Power Research Institute, 1982.
  6. [6] G. Casella & R. Berger, Statistical inference (Duxbury, USA:John Wiley & Sons, 1996).
  7. [7] A. Agresti, An Introduction to categorical data analysis (USA: John Wiley & Sons, 2002).

Important Links:

Go Back