A. Domijan, Jr., R.K. Matavalam, A. Montenegro, W.S. Wilcox, Y.S. Joo, L. Delforn, J.R. Diaz, L. Davis, J. D'Agostini
[1] 2001 cost of downtime, Contingency Planning Research (CPR)and Contingency Planning & Management Magazine (CPM). [2] T.E. Grebe, D.D. Sabin, & M.F. McGranaghan, An assessmentof distribution system power quality, Volume 1: Executivesummary, EPRI Report TR-106294-V1, Palo Alto, CA, May 1996. [3] D.D. Sabin, An assessment of distribution system power quality,Volume 2: Statistical summary report, EPRI Report TR-106294-V2, Palo Alto, CA, May 1996. [4] D.L. Brooks & D.D. Sabin, An assessment of distributionsystem power quality, Volume 3: The library of distributionsystem power quality monitoring case studies, EPRI ReportTR-106294-V3, Palo Alto, CA, May 1996. [5] Transmission line reference book, 345kV and above, 2nd ed.,Electric Power Research Institute, 1982. [6] G. Casella & R. Berger, Statistical inference (Duxbury, USA:John Wiley & Sons, 1996). [7] A. Agresti, An Introduction to categorical data analysis (USA: John Wiley & Sons, 2002).
Important Links:
Go Back