A New Technique for Forecasting Hourly Load for Long-Term Planning

Q. Ahsan and M.A. Jalil

References

  1. [1] WASP–III Guidebook (Geneva: International Atomic EnergyAgency, 1984).
  2. [2] X. Wang & J.R. McDonald, Modern power system planning(New York: McGraw-Hill, 1994).
  3. [3] A. Keyhani, A simulation study for recursive prediction ofhourly load demands, 1977 Power Industry Computer Applications Conf., Toronto, ON, 1977, 228–236.
  4. [4] V. Panuska, Short-term forecasting of electric power systemload from a weather-dependent model, IFAC Symp. 1977 onAutomatic Control and Protection of Electric Power Systems,Melbourne, Australia, 1977, 414–418.
  5. [5] A.S. Dehdashti, J.R. Tudor, & M.C. Smith, Forecasting ofhourly load by pattern recognition: A deterministic approach,IEEE Trans., PAS-101 (9), 1982, 3290–3294. doi:10.1109/TPAS.1982.317537
  6. [6] K. Srinivasan & R. Pronovost, Short-term load forecastingusing multiple correlation models, IEEE Trans., PAS-94 (5),1975, 1854–1858. doi:10.1109/T-PAS.1975.32031
  7. [7] P.C. Gupta & K. Yamada, Adaptive short-term forecasting ofhourly loads using weather information, IEEE Trans., PAS-91,1972, 2085–2094. doi:10.1109/TPAS.1972.293541
  8. [8] E.H. Barakat & J.M. Al-Qasem, Methodology for weekly loadforecasting, IEEE Trans., PAS 13 (4), 1998, 1548–1555 doi:10.1109/59.736304
  9. [9] H.S. Hippert, C.E. Pedreira, & R.C. Souza, Neural networksfor short-term load forecasting: A review and evaluation, IEEETrans. Power Systems, 16 (1), 2001, 44–55. doi:10.1109/59.910780
  10. [10] M.A. Jalil & Q. Ahsan, Impacts of load model on the generationexpansion plan of a utility, Conf. Proc. of ICERD-2, Kuwait,2002, 139–150.
  11. [11] M.A. Jalil, Comparison of the reliability and production costof the generation system of Bangladesh Power System masterplan, master’s thesis, Bangladesh University of Engineeringand Technology, Dhaka, 2000.
  12. [12] T. Haida & S. Muto, Regression based peak load forecastingusing a transformation technique, IEEE Trans. Power Systems,9 (4), 1994, 1788–1794. doi:10.1109/59.331433
  13. [13] A. Haque, Q. Ahsan, & W.C. Beattie, A load forecastingtechnique for an isolated area, Proc. ISEDEM, Singapore,1993, 289–293.
  14. [14] R.M. Bethea, B.S. Duran, & T.L. Boullion, Statistical methods for engineers and scientists, 2nd ed., (New York: Marceldekker inc. 1985) 301-373.

Important Links:

Go Back