SELF-ADAPTIVE OPTIMAL ALLOCATION STRATEGY OF EMERGENCY RESOURCES FOR POWER DISTRIBUTION NETWORK FAILURES, 1-9.

Shan Li, Yanke Dong, Wei Zhang, and Zhidu Huang

References

  1. [1] L.J. Yang, J. Zhang, H.L. Cheng, and Z.G. Lu, Atask allocation strategy of multi-fault rush repair fordistribution network based on optimum utility, Transactionsof China Electrotechnical Society, 29(6), 2014, 263–270+289.doi:10.19595/j.cnki.1000-6753.tces.2014.06.034.
  2. [2] L.J. Yang, X.J. Lv, D. Li, M. Wang, Z.G. Lu, and Q. Yu,Coordination optimization strategy of multi-fault repair andrecovery for distribution network with distributed generators,Automation of Electric Power Systems, 40(20), 2016, 13–19.
  3. [3] Z.G. Lu and K.S. Wang, Multi-agent based rush repair schedul-ing for distribution networks, Power System Technology, 37(1),2013, 137–143. doi:10.13335/j.1000-3673.pst.2013.01.026.
  4. [4] J. Zhou, L.C. Pang, W.H. Ye, and F.P. Li, Intelligent schedulingfor the fault repairing resources of distribution network basedon information platform, Electrics and Packaging, 12(11),2012, 45–48. doi:10.16257/j.cnki.1681-1070.2012.11.002.
  5. [5] J. Liu, J.Q. Xu, and H.L. Cheng, Algorithms on fastrestoration of large area breakdown of distribution systemsunder emergency states, Proceedings of the CSEE, 24(12),2004, 132–138. doi:10.13334/j.0258-8013.pcsee.2004.12.025.
  6. [6] Y.Q. Xu, L. Zhang, Z.P. Wang, and X.D. Li, Algorithmof service restoration for large area blackout in distri-bution network with distributed generators, Transactionsof China Electrotechnical Society, 25(4), 2010, 135–141.doi:10.19595/j.cnki.1000-6753.tces.2010.04.023.
  7. [7] W.Z. Gong and X.Y. Fang, Research of distribution systemservice restoration algorithm based on hybrid encoding, PowerSystem Protection and Control, 40(6), 2012, 104–108.
  8. [8] L.J. Yang, J.C. Liu, Z.G. Lu, and L.J. Cao, Fault restorationof multi-objective distribution system based on multi-agentevolutionary algorithm, Power System Protection and Control,40(4), 2012, 54–58.
  9. [9] C. Zhang, K. Peng, H. Li, B.Y. Xu, and Y. Chen, Fault calcu-lation method of distribution network based on deep learning,Symmetry, 13(6), 2021, 1086. doi:10.3390/sym13061086.
  10. [10] B. Kim, N. Rusetskii, H. Jo, and I. Kim, The optimal allocationof distributed generators considering fault current and levelizedcost of energy using the particle swarm optimization method,Energies, 14(2), 2021, 418. doi:10.3390/en14020418.
  11. [11] P.Y. Ye, H.J. Du, and X. Shen, Application of the Dijkstraalgorithm in the best repairing path, Power System Protectionand Control, 34(12), 2006, 39–41+51.
  12. [12] Q. Wu, H. Teng, and K.F. Wang, Structure of electrical repairsreal-time scheduling system based on GPRS/GPS/GIS, PowerSystem Protection and Control, 33(17), 2005, 70–73.
  13. [13] Y.B. Dong, J.P. Jiang, and Y. He, Fitness-based task allocationstrategy for multi-robot system, Journal of Zhejiang University(Engineering Science), 41(2), 2007, 272–277.
  14. [14] G.Y. Chen, H.Q. Liu, W.X. Qiu, D.X. Li, Z.G. Lu, and T. Feng,Fitness-based task allocation strategy for multi-fault repair ofdistribution system, Electric Power Automation Equipment,34(11), 2014, 67–74.
  15. [15] S.Q. Ye, Re-modeling on just allocation of resource and analysisof the effective algorithm, Journal of Jinan University (NaturalScience & Medicine Edition), 24(5), 2003, 11–18.
  16. [16] P. Dinakara Prasad Reddy, V.C. Veera Reddy, andT. Gowri Manohar, Optimal renewable resources placementin distribution networks by combined power loss indexand whale optimization algorithms, Journal of ElectricalSystems and Information Technology, 5(2), 2018, 175–191.doi:10.1016/j.jesit.2017.05.006.
  17. [17] A. Arasteh, P. Alemi, and M. Beiraghi, Optimal allocation ofphotovoltaic/wind energy system in distribution network usingmeta-heuristic algorithm, Applied Soft Computing, 109, 2021,107594. doi:10.1016/j.asoc.2021.107594.
  18. [18] K.S. Sambaiah and T. Jayabarathi, Optimal allocation of windand solar based distributed generation in a radial distributionsystem, International Journal of Renewable Energy Research,9(1), 2019, 73–85.
  19. [19] J.W. Zhang, L.Z. Zhang, and X.C. Huang, A multi-fault rushrepair strategy for distribution network based on genetic-topology algorithm, Automation of Electric Power Systems,32(22), 2008, 32–35+60.
  20. [20] A. Awad, H. Abdel-Mawgoud, S. Kamel, A.A. Ibrahim,and F. Jurado, Developing a hybrid optimization algorithmfor optimal allocation of renewable DGs in distribu-tion network, Clean Technologies, 3(2), 2021, 409–423.doi:10.3390/cleantechnol3020023.
  21. [21] C.K. Das, O. Bass, T.S. Mahmoud, G. Kothapalli, N. Mousavi,D. Habibi, and M.A. Masoum, Optimal allocation of distributedenergy storage systems to improve performance and powerquality of distribution networks, Applied Energy, 252, 2019,113468. doi:10.1016/j.apenergy.2019.113468.
  22. [22] A. Ramadan, M. Ebeed, S. Kamel, and L. Nasrat, Optimal allo-cation of renewable energy resources considering uncertaintyin load demand and generation, Proc. 2019 IEEE Conf. PowerElectronics and Renewable Energy (CPERE), Aswan, Egypt,2019, 124–128. doi:10.1109/CPERE45374.2019.8980092.
  23. [23] H. Abdel-Mawgoud, S. Kamel, M. Ebeed, and M.M. Aly,An efficient hybrid approach for optimal allocation of DG inradial distribution networks, Proc. 2018 International Conf.Innovative Trends in Computer Engineering (ITCE), Aswan,Egypt, 2018, 311–316. doi:10.1109/ITCE.2018.8316643.
  24. [24] T. Thangam and K. Muthuvel, PFoPID control design ofgrid-connected PV inverter for MPPT using hybrid algorithm,International Journal of Power and Energy Systems, 42(10),2022, 1–8. doi:10.2316/J.2022.203-0232.
  25. [25] A. Ahmed, M.R. Hazari, E. Jahan, and M.A. Mannan,A robust control strategy to improve low voltage ride-through of a grid-connected photovoltaic system, InternationalJournal of Power and Energy Systems, 41(1), 2021, 9–16.doi:10.2316/J.2021.203-0299.

Important Links:

Go Back