A DATA-DRIVEN INTELLIGENT EARLY WARNING METHOD FOR TRANSMISSION TOWER TILT, 1-8.

Da Chang, Tianyi Zhang, Guohan Ma, Jingfeng Wang, and Ru Liu

References

  1. [1] X. Fu and H.N. Li, Uncertainty analysis of thestrength capacity and failure path for a transmissiontower under a wind load, Journal of Wind Engineeringand Industrial Aerodynamics, 173, 2018, 147–155.https://doi.org/10.1016/j.jweia.2017.12.009
  2. [2] D. Dempsey and H. White, Winds wreak havoc on lines,Transmission and Distribution World, 48(6), 1996, 32–37.
  3. [3] M. Dihkan and E. Mus, Automatic detection of powertransmission lines and risky object locations using UAV LiDARdata, Arabian Journal of Geosciences, 14(7), 2021, 1–13.https://doi.org/10.1007/s12517-021-06947-1
  4. [4] Q. Xu, X. Liu, K. Zhu, P.W. Pong, and C. Liu, Magnetic-field-sensing-based approach for current reconstruction, sagdetection, and inclination detection for overhead transmissionsystem, IEEE Transactions on Magnetics, 55(7), 2019, 1–7,DOI: 10.1109/TMAG.2019.2905567.
  5. [5] R. Jenssen and D. Roverso, Automatic autonomous vision-based power line inspection: A review of current statusand the potentialrole of deep learning, International Journalof Electrical Power & Energy Systems, 99, 2018, 107–120.https://doi.org/10.1016/j.ijepes.2017.12.016
  6. [6] X. Zhang, Y. Zhao, L. Zhou, J. Zhao, W. Dong, M. Zhang, andX. Lv, Transmission tower tilt monitoring system using low-power wide-area network technology, IEEE Sensors Journal,21(2), 2021, 1100–1107, DOI: 10.1109/JSEN.2020.3004817.
  7. [7] J. Wang, X. Fu, and H.N. Li, Dynamic analysis of a transmissiontower-line system under wind loading with multiple factors,Journal of Shenyang Jianzhu University (Natural Science),36(1), 2020, 1–10, DOI: 10.11717/j.issn:2095-1922.2020.01.01.
  8. [8] X.J. Yang, J.S. Huang, J.G. Zhang, and Y. Lei, Effectivesimulation of stochastic fluctuating wind field of transmissiontower-line system based on interpolation and dimensionreduction method, Journal of Vibration and Shock, 40(9),2021, 77–83. DOI: 10.13465/j.cnki.jvs.2021.09.011
  9. [9] J.M. Li, X.Y. Peng, and T. Jiang, Design of wind-excited high-voltage transmission tower body-cable hazardmonitoring system, Technology Wind, 24, 2017, 197, DOI:10.19392/j.cnki.1671-7341.201724176.
  10. [10] J. Zhao, S. Guo, and D. Mu, DouBiGRU-A: Softwaredefect detection algorithm based on attention mechanism anddouble BiGRU, Computers & Security, 111, 2021, 102459.https://doi.org/10.1016/j.cose.2021.102459
  11. [11] J. Zhao, X. Zhang, F. Di, S. Guo, X. Li, X. Jing,and D. Mu, Exploring the optimum proactive defensestrategy for the power systems from an attack perspective,Security and Communication Networks, 2021, 2021, 6699108.https://doi.org/10.1155/2021/6699108
  12. [12] X. Liu, K. Hou, H. Jia, J. Zhao, L. Mili, X. Jin, and D.Wang, A planning-oriented resilience assessment frameworkfor transmission systems under typhoon disasters, IEEETransactions on Smart Grid, 11(6), 2020, 5431–5441, DOI:10.1109/TSG.2020.3008228.
  13. [13] R. Zhou, W. Jiang, W. Huang, B. Xu, and S. Jiang,A heuristic method for power pylon reconstruction fromairborne LIDAR data, Remote Sensing, 9(11), 2017, 1172.https://doi.org/10.3390/rs9111172
  14. [14] Ministry of Housing and Urban-Rural Development of thePeople’s Republic of China, Load code for the design of buildingstructures: GB50009-2012. (Beijing: China Architecture &Building Press, 2012), pp. 30–62. https://www.mohurd.gov.cn/gongkai/fdzdgknr/tzgg/201207/20120723 210754.html
  15. [15] Ministry of Housing and Urban-Rural Development of thePeople’s Republic of China, General code for engineeringstructures: GB55001-2021. (Beijing: China Architecture &Building Press, 2021), pp. 21–23. https://www.mohurd.gov.cn/gongkai/fdzdgknr/zfhcxjsbwj/202107/20210715 761192.html
  16. [16] State Grid Corporation of China, Code for construction andacceptance of 1000kV overhead transmission line: Q/GDW153-2006. (Beijing: China State Grid Corp of the People’sRepublic of China, 2007).
  17. [17] National Energy Administration, Operating code for overheadtransmission line: DL/T 741-2019. (Beijing: China ElectricPower Press, 2019).

Important Links:

Go Back