Zeng-shun Chen, Jian-ting Zhou , Gang Hu, Yong Li, Hu Ma, and Guo-wen Yao
[1] W. Guo, F. Gao, and S. Mekid, A new analysis of workspaceperformances and orientation capability for 3-DOF planarmanipulators, International Journal of Robotics & Automation,25, 2010, 89. [2] B.P. DeJong, Two- and three-dimensional auditory occupancygrids with a mobile robot, International Journal of Roboticsand Automation, 29, 2014, 14–22. [3] F. Xu, J. Hu, X. Wang, and G. Jiang, Helix cable-detectingrobot for cable-stayed bridge: design and analysis, Interna-tional Journal of Robotics and Automation, 29, 2014, 406–414. [4] N.-F. Pan, Fuzzy AHP approach for selecting the suitablebridge construction method, Automation in Construction, 17,2008, 958–965. [5] Y.-B. Shen and Y. Luo, Accumulative sliding constructionmethod for large-span latticed shells, Journal of ConstructionEngineering and Management, 136, 2010, 1154–1157. [6] N.-H. Pan, T.-C. Chiu, and K.-Y. Chen, Full-span pre-castlaunching method (FPLM) analysis with dynamic simulation—case studies of Taiwan High-Speed Rail (THSR) Project,Automation in Construction, 17, 2008, 592–607. [7] H. Said, M. Marzouk, and M. El-Said, Application of com-puter simulation to bridge deck construction: Case study,Automation in Construction, 18, 2009, 377–385. [8] K. Jung, K. Kim, C. Sim, and J.J. Kim, Verification of incre-mental launching construction safety for the Ilsun bridge, theworld’s longest and widest prestressed concrete box girder withcorrugated steel web section, Journal of Bridge Engineering,16, 2010, 453–460. [9] R.-J. Dzeng and W.-C. Wang, Automatic schedule integrationfor highway projects, Automation in Construction, 12, 2003,447–461. [10] H. Sousa, J. Bento, and J. Figueiras, Assessment and manage-ment of concrete bridges supported by monitoring data-basedfinite-element modeling, Journal of Bridge Engineering, 19,2014, 05014002. [11] T. Zayed, M.R. Sharifi, S. Baciu, and M. Amer, Slip-formapplication to concrete structures, Journal of ConstructionEngineering and Management, 134, 2008, 157–168. [12] T. Abdelhamid, M. El-Gafy, and P. Mitropoulos, Selectionof roof casting formwork systems for the bird island project:Case study, Practice Periodical on Structural Design andConstruction, 14, 2009, 224–241. [13] H.-G. Kwak and J.-K. Son, Determination of design moments inbridges constructed with a movable scaffolding system (MSS),Computers & Structures, 84, 2006, 2141–2150. [14] P. Pacheco, A. Andr´e, T. Oliveira, and P. Borges, Automationrobustness of scaffolding systems strengthened with organicprestressing, Automation in Construction, 19, 2010, 1–10. [15] A. Thrall, S. Adriaenssens, I.P. Zaforteza, and T. Zoli,A linkage-based movable bridge form: Design and optimization,Structures Congress 2012, 2012, 391–400. [16] Z.S. Chen, C. Zhang, J.T. Zhou, J. Song, and C.R. Huang,Study of cable force of construction control and alignmentcontrol of main girders for long-span railway cable-stayedbridges, Modern Applied Science, 7, 2013, 47. [17] Y.-K. Cho, C.T. Haas, K. Liapi, and S. Sreenivasan, A frame-work for rapid local area modeling for construction automation,Automation in Construction, 11, 2002, 629–641. [18] M. Bruneau, C.-M. Uang, and S.R. Sabelli, Ductile design ofsteel structures (USA: McGraw Hill Professional, 2011). [19] R.F. Gibson, Principles of composite material mechanics (USA:CRC Press, 2011). [20] TB10002.2, Code for design of steel structure of railway bridge.National Standard of the People’s Republic of China, 2005. [21] T.-H. Yi, H.-N. Li, and M. Gu, Experimental assessment ofhigh-rate GPS receivers for deformation monitoring of bridge,Measurement, 46, 2013, 420–432. [22] A. McCrea, D. Chamberlain, and R. Navon, Automated in-spection and restoration of steel bridges—a critical review ofmethods and enabling technologies, Automation in Construc-tion, 11, 2002, 351–373. [23] Y. Zhang and L. Bai, Rapid structural condition assessmentusing radio frequency identification (RFID) based wirelessstrain sensor, Automation in Construction, 54, 2015, 1–11. [24] S. Moon, E. Choi, and B. Yang, Holistic integration basedon USN technology for monitoring safety during concreteplacement, Automation in Construction, 57, 2015, 112–119.
Important Links:
Go Back