Sandeep Nimmagadda, Mark A. Harral, and Stephen B. Bayne
[1] The Brattle Group, Energy ambitions: can wind work in a LMP MARKET, Current Topics in Energy Markets and Regulation, 1, 2005, 1–6. [2] K. Porter, The implications of regional transmission organization design for renewable energy technologies, National Renewable Energy Laboratory, May 2002. http://www.nrel.gov/docs/fy02osti/32180.pdf [3] PJM Interconnection, PJM manual 2: transmission service request, Revision: 12, Prepared by: Transmission Service Department, Effective Date: December 3, 2012. [4] C. Batlle, R. Gómez-Elvira, Forward cross-border transmission capacity allocation: physical versus financial transmission rights, http://www.iit.upcomillas.es/batlle/Publications/ [5] S. Nimmagadda, M.A. Harral, and S.B. Bayne, Challenges of obtaining financial transmission rights for wind projects, Proc. IASTED Int. Conf. Power and Energy, Marina Del Rey, November 11–13, 2013, 111–118. [6] R.W. de Mello, Understanding financial transmission rights, Power transmission and distribution, Power technology, Siemens, 102. [7] PJM Interconnection, PJM manual 06, financial transmission rights, Revision: 13, Prepare by: Market Simulation Department, Effective Date: June 28, 2012. [8] CRR Educational Class #2, Locational marginal pricing (LMP): basics of nodal price calculation, CAISO Market Operations. [9] Commission for Energy Regulation, ESB customer supply response to CER draft decision on FTRs, http://www.cer.ie/en/documents-by-year.aspx?year=2003. [10] Repower Systems 3.0 M122, Maximum efficiency at low wind sites, http://www.repower.de/fileadmin/download/produkte/PP_3.0M122_uk_2013.pdf [11] K. Neuhoff , B.F. Hobbs, D. Newbery, Congestion management in European power networks: criteria to assess the available options, Smart Power Market Project, Electricity Policy Research Group, University of Cambridge, January 2011.
Important Links:
Go Back