INTEGRATING RENEWABLE ELECTRICITY PRODUCTION IN SOME EUROPEAN COUNTRIES INTO THE GRIDS

T.J. Hammons

References

  1. [1] S. Kohler, Energiewirtschaftliche Planung f¨ur die Netzin-tegration von Windenergie-anlagen in Deutschland, VDE-Kongress 2004, ETG Fachtagung, Nachhaltige Energiever-sorgung, Berlin, October 2004, 18–20.
  2. [2] U. Keussen, Folgen der Windenergieeinspeisung und Verteilungihrer Lasten, FGE Tagung 2003, Aachen, September 2003,11–12.
  3. [3] Sassnick et al., Influence of increased wind energy infeed onthe transmission network, Paper C6-107, Proceedings CIGRE2004, CIGRE, Paris, 29 August–3 September 2004.
  4. [4] REA generating plants connected to the high- and extra-highvoltage network, Guidelines (in addition to the grid codes) forrenewable-based generating plants’ connection to and paralleloperation on the high- and extra-high voltage network. VDN,August 2004.
  5. [5] Eigenerzeugungsanlagen am Mittelspannungsnetz, VereinigungDeutscher Elektrizit¨atswerke – VDEW – e.v. (Hrsg.), 2. Aus-gabe. Frankfurt am Main: VWEW Energieverlag 1998. ISBN3-8022-0584-7.
  6. [6] B. Buchholz et al., Advanced planning and operation of dis-persed generation ensuring power quality, security and effi-ciency in distribution systems. CIGRE 2004, Paris, 29 August–3September 2004.
  7. [7] J. Scholtes & C. Schwaegerl, Energy Park KonWerl: Energymanagement of a decentralized supply system. Concept andfirst results. First International conference on the Integration ofRenewable Energy Sources and Distributed Energy Resources.Brussels, December 2004, 1–3.
  8. [8] M. Bechberger & D. Reiche, Renewable energy policies in anenlarged European Union, RE in EU-28, Refocus Magazine,September/October 2003.
  9. [9] European Renewable Energy Sources, Available on http://www.erec-renewables.org
  10. [10] Regulatory Authority of Greece, Available on http://www.rae.gr
  11. [11] Public Power Corporation, Available on http://www.dei.gr
  12. [12] 3rd Operational program “Competitiveness , Available onhttp://www.antagonistikotita.gr
  13. [13] T. Tsoutsos, I. Mavrogiannis, N. Karapanagiotis, S. Tselepis,& D. Agoris, An analysis of the Greek photovoltaic market,Renewable and Sustainable Energy Reviews, 8, 2004, 49–72.
  14. [14] Centre for Reneable Energy Sources, Available on http://www.cres.gr
  15. [15] J. Stefanakis, CRETE: An ideal case study for increased windpower penetration in medium sized autonomous power systems,IEEE Winter Meeting, PPC, Greece, 1999.
  16. [16] Greek Association of RES Electricity Producers, Available onhttp://www.hellasres.gr
  17. [17] A. Tsikalakis, I. Tassiou, & N. Hatziargyriou, Impact of EnergyStorage in the Secure and Economic Operation of Small Islands,MedPower04, Larnaca, Cyprus, 15–17 November 2004.
  18. [18] Crete System Annual Report PPC, 2001.
  19. [19] N. Hatziargyriou, A.G. Tsikalakis, A. Dimeas, D. Georgiadis,A. Gigantidou, J. Stefanakis, & E. Thalassinakis, Security andeconomic impacts of high wind power penetration in islandsystems, 2004 CIGRE Session, Paris, August 2004.
  20. [20] N. Hatziargyriou et al., MORE CARE overview, Proc. ofMedPower02, MED02/002 Athens, November 2002.
  21. [21] G. Kariniotakis, D. Mayer, J.A. Halliday, A.G. Dutton, A.D.Irving, R.A. Brownsword, P.S. Dokopoulos, & M.C. Alexiadis,Load, wind and hydro power forecasting functions of the more-care EMS system, Proc. of MedPower02, MED02/003 Athens,November 2002.
  22. [22] N.D. Hatziargyriou, I. Skotinos, A. Tsikalakis, & A. Dimeas,Economic evaluation of energy production systems with highwind power penetration, application to the Greek NationalInterconnected system, 2004 EWEA Conference, London.
  23. [23] IEC 61400-21, Wind Turbine Generator Systems – Part 21:Measurement and Assessment of Power Quality Characteristicsof Grid Connected Wind Turbines, Edition 1 InternationalStandard, 2001.
  24. [24] Eltra Requirements for wind farms connected to the trans-mission grid. Second Edition. Document No 74174 (2000).http://www.eltra.dk/media/1030_12368.pdf. In Danish.
  25. [25] M.T. Palsson, T. Toftevaag, K. Uhlen, & J.O.G. Tande, Large-scale wind power integration and voltage stability limits inregional networks, 2002 IEEE-PES Summer Meeting, Proceed-ings. Paper sponsored by Power System Dynamic PerformanceCommittee, Session on Power System Stability Control usingPower Electronic Devices, 1–8.
  26. [26] M.T. Palsson, T. Toftevaag, K. Uhlen, & J.O.G. Tande, Controlconcepts to enable increased wind power penetration, 2003IEEE-PES Summer Meeting, Proceedings. Panel Paper 00534sponsored by Power System Dynamic Performance Committee,Session on Wind Generation Modeling and Controls, 1–7.
  27. [27] J.O.G. Tande & K. Uhlen, Cost analysis case study of gridintegration of larger wind farms, Wind Engineering, 28 (3),2004, 265–273.
  28. [28] Decreto-Lei n◦. 313/2001, from December 10th. Di´ario daRep´ublica n◦. 284, p´ags. 8024–8031, In Portuguese. Availableon http://www.dr.incm.pt
  29. [29] Real Decreto 436/2004, from 12 March, In Spanish. Availableon “Normativas em www.omel.sp.
  30. [30] Condiciones T´ecnicas Aplicables a la Generation de RegimenEspecial no Gestionable, In Spanish. Red El´ectrica de Espa˜na,Enero, 2004.
  31. [31] E.D. Castronuovo & J.A. Pe¸cas Lopes, On the optimizationof the daily operation of a wind–hydro power plant, IEEETransactions in Power Systems, 19 (3), 2004, 1599–1606.
  32. [32] ESB National Grid, Minimum size for wind Farms version 1.7,Available on http://www.eirgrid.com

Important Links:

Go Back