FUZZY EVALUATION MODEL FOR UNCERTAINTIES IN ELECTRICAL NETWORK PLANNING

C.W. Gao,∗ H.Z. Cheng,∗ and H.B. Zhai∗

References

  1. [1] T.S. Chung, K.K. Li, & G.J. Chen, Multi-objective transmissionnetwork planning by a hybrid GA approach with fuzzy decisionanalysis, International Journal of Electrical Power and EnergySystems, 25 (3), 2003, 187–192.
  2. [2] M.T. Schilling, A.M. Leite da Silva, & R. Billinton, Bibliographyon power system probabilistic analysis, IEEE Transactions onPower Systems, 5 (1), 1990, 1962–1988.
  3. [3] R.H. Liang, Application of grey linear programming to short-term hydro scheduling, Electric Power Systems Research, 41 (3),1997, 159–165.
  4. [4] H.Z. Cheng & H.F. Zhu, Flexible method for power networkplanning using the unascertained number, Electric Power Sys-tems Research, 68 (1), 2004, 41–46.303
  5. [5] M.O. Buygi, G. Balzer, & H.M. Shanechi, Market-based trans-mission expansion planning, IEEE Transactions on Power Sys-tems, 19 (4), 2004, 2060–2067.
  6. [6] E. Van Geert, Increased uncertainty a new challenge for powersystem planners, 1998 IEE Colloquium on Tools and Techniquesfor Dealing with Uncertainty, London, UK, 1998, 1–6.
  7. [7] E.L. Da Silva, H.A. Gil, & J.M. Areiza, Transmission networkexpansion planning under an improved genetic algorithm, IEEETransactions on Power Systems, 15 (3), 2000, 1168–1174.
  8. [8] C. Okoli & D.S. Pawlowski, The Delphi method as a research tool:an example, design considerations and applications, Informationand Management, 42 (1), 2004, 15–29.
  9. [9] C.W. Gao, H.Z. Cheng, & C.W. Jiang, Particle swarm optimiza-tion based hybrid algorithm for transmission expansion planning,WSEAS Transactions on Electronics, 2 (4), 2005, 119–127.

Important Links:

Go Back