A SIMULATION APPROACH FOR STOCHASTIC EMPLOYEE DAYS-OFF SCHEDULING

H.K. Alfares∗

References

  1. [1] G. Fellers, Use of GPSS/PC to establish manning levels of aproposed just-in-time production facility, Computers & Indus-trial Engineering, 11(1–4), 1986, 382–384.
  2. [2] J.S. Burton, A. Banerjee, & C. Sylla, A simulation study ofsequencing and maintenance decisions in a dynamic job shop,Computers & Industrial Engineering, 17(1–4), 1989, 447–452.
  3. [3] J.K. Cochran, D.E. Chu, & M.D. Chu, Optimal staffingfor cyclically scheduled processes, International Journal ofProduction Research, 35(12), 1997, 3393–3403.
  4. [4] D.J. Davis & V.A. Mabert, Order dispatching and labor as-signment in cellular manufacturing systems, Decision Sciences,31(4), 2000, 745–771.
  5. [5] K.K. Yang, S. Webster, & R.A. Ruben, An evaluation offlexible workday policies in job shops, Decision Sciences, 33(2),2002, 223–249.
  6. [6] M. Draeger, An emergency department simulation model usedto evaluate alternative nurse staffing and patient populationscenarios, Proc. IEEE 1992 Winter Simulation Conf., Arling-ton, Virginia, December 13–16, 1992, 1057–1064.
  7. [7] R.S. Dittus, R.W. Klein, D.J. DeBrota, M.A. Dame, & J.F.Fitzgerald, Medical resident work schedules: Design and eval-uation by simulation modeling, Management Science, 42(6),1996, 891–906.
  8. [8] M.D. Rossetti, G.F. Trzcinski, & S.A. Syverud, Emergencydepartment simulation and determination of optimal attendingphysician staffing schedules, Proc. IEEE 1999 Winter Simula-tion Conf., Phoenix, Arizona, December 5–9, 1999, 1532–1540.
  9. [9] N. Li & L.X. Li, (2000), Modeling staffing flexibility: A caseof China, European Journal of Operational Research, 124(2),2000, 255–266.
  10. [10] R. Klungle, Simulation of a claims call center: A success and afailure, Proc. IEEE 1999 Winter Simulation Conf., Phoenix,Arizona, December 5–9, 1999, 1648–1653.
  11. [11] K. Smyllie, Data milling and simulation applied to a staffscheduling problem, High-Performance Computing and Net-working, Proceedings, Lecture Notes in Computer Science,1593, 1999, 1190–1193.
  12. [12] A.J. Mason, D.M. Ryan, & D.M. Panton, (1998), Integratedsimulation, heuristic and optimization approaches to staffscheduling, Operations Research, 46(2), 1998, 161–175.
  13. [13] L.D. Smith, Staffing geographically distributed service facilitieswith itinerant personnel, Computers & Operations Research,29(14), 2002, 2023–2041.
  14. [14] Symix Systems, Inc., AweSim! Version 3.0, Student Version,1999.

Important Links:

Go Back