GENETIC-FUZZY-BASED POWER SCHEDULING TECHNIQUE FOR MULTIOBJECTIVE LOAD DISPATCH PROBLEM

Y.S. Brar, J.S. Dhillon, and D.P. Kothari

References

  1. [1] C.M. Fonseca & P.J. Fleming, Multiobjective optimisation andmultiple constraint handling with evolutionary algorithms-PartI: A unified formulation, IEEE Transactions on SMC-Part A:Systems and Humans, 28 (1), 1998, 26–37. doi:10.1109/3468.650319
  2. [2] D.E. Goldberg, Genetic algorithm in search, optimisation, andmachine learning (New York: Addison-Wesley, 1989).
  3. [3] S.O. Orero & M.R. Irving, Economic dispatch of generatorswith prohibited operating zones: A genetic algorithm approach,IEE Proceedings-C Generation Transmission and Distribution,143 (6), 1996, 529–534. doi:10.1049/ip-gtd:19960626
  4. [4] A.G. Bakirtzis, P.N. Biskas, C.E. Zoumas, & V. Petridis,Optimal power flow by enhanced genetic algorithm, IEEETransactions on PWRS, 17 (2), 2002, 229–236. doi:10.1109/TPWRS.2002.1007886
  5. [5] N. Ruangpayoongsak, W. Ongsakul, & S. Runggeratigul, Con-strained economic dispatch by combined genetic and simulatedannealing algorithm, Electric Power Components and Systems,30, 2002, 917–931. doi:10.1080/15325000290085235
  6. [6] M.A. Abido, Environmental/economic power dispatch usingmultiobjective evolutionary algorithms, IEEE Transactions on Power Systems, 18 (4), 2003, 1529–1537. doi:10.1109/TPWRS.2003.818693
  7. [7] J. Kubokawa, H. Sasaki, N. Yorino, R. Yokoyama et al., A fastsolution method for multiobjective optimal power flow using aninteractive approach, Electrical Engineering in Japan, 114 (2),1994, 57–66.
  8. [8] C.M. Huang, H.T. Yang, & C.L. Huang, Bi-objective powerdispatch using fuzzy satisfaction-maximizing decision approach,IEEE Transactions on PWRS, 12 (4), 1997, 1715–1721. doi:10.1109/59.627881
  9. [9] C.S. Chang & W. Fu, Stochastic multiobjective generationdispatch of combined heat and power systems, IEE Proceedings-C Generation Transmission and Distribution, 145 (5), 1998,583–591. doi:10.1049/ip-gtd:19981997
  10. [10] J.S. Dhillon, S.C. Parti, & D.P. Kothari, Fuzzy decision makingin multiobjective long-term scheduling of hydrothermal system,Electrical Power & Energy Systems, 24, 2001, 19–29. doi:10.1016/S0142-0615(00)00031-4
  11. [11] J.S. Dhillon, S.C. Parti, & D.P. Kothari, Fuzzy decisionmaking in stochastic multiobjective short-term hydrothermalscheduling, IEE Proceedings-C Generation Transmission andDistribution, 149, 2002, 191–200.
  12. [12] Y.S. Brar, J.S. Dhillon, & D.P. Kothari, Multiobjective loaddispatch by fuzzy logic based searching weightage pattern,Electric Power Systems Research, 63, 2002, 149–160.
  13. [13] IEEE Current Operating Problems Working Group, Potentialimpacts of clean air regulations on system operations, IEEETransactions, 10, 1995, 647–653.
  14. [14] C.E. Lin, S.T. Chen, & C.L. Huang, A two-step sensitivityapproach for real-time line flow calculation, Electric PowerSystems Research, 21, 1991, 63–69. doi:10.1016/0378-7796(91)90038-O
  15. [15] W.Y. Ng, Generalized generation distribution factors for powersystem security evaluations, IEEE Transactions on PAS,100 (3), 1981, 1001–1005. doi:10.1109/TPAS.1981.316635
  16. [16] M. Sakawa, H. Yano, & T. Yumine, An interactive fuzzy sat-isficing method for multiobjective linear programming prob-lems and its applications, IEEE Transactions, SMC-17, 1987,654–661.

Important Links:

Go Back