EVALUATION AND SELECTION FOR AVAILABILITY IMPROVEMENT OF FREQUENCY CONVERTERS IN ELECTRIFIED RAILWAY

Yasser A. Mahmood, Alireza Ahmadi, and Ajit K. Verma

References

  1. [1] Y.A. Mahmood, A. Ahmadi, R. Karim, U. Kumar, A.K.Verma, and N. Fransson, Comparison of frequency converteroutages: A case study on the Swedish TPS system, Proc. ofIntern. Conf. of World Academy of Science, Engineering andTechnology, Issue No. 71, Paris 2012, 2298.
  2. [2] J. Setreus, P. Hilber, S. Arnborg, and N. Taylor, Identifyingcritical components for transmission system reliability, IEEETransactions on Power Systems, 27(4), 2012, 2106–2115.
  3. [3] S.K. Chen, T.K. Ho, and B.H. Mao, Reliability evaluationsof railway power supplies by fault-tree analysis, IET ElectricPower Applications, 1(2), 2007, 161–172.
  4. [4] Y.A. Mahmood, A. Ahmadi, and A.K. Verma, Identificationof frequency converter models for availability improvement,International Journal of Electrical Engineering, 20, 2013,159–169.
  5. [5] T.E. Ekstrom, Reliability/availability guarantees of gas turbineand combined cycle generating units, IEEE Transactions onIndustry Applications, 31(4), 1995, 691–707.
  6. [6] A.I. Chatzimouratidis and P.A. Pilavachi, Technological, eco-nomic and sustainability evaluation of power plants usingthe analytic hierarchy process, Energy Policy, 37(3), 2009,778–787.
  7. [7] G. Xu, Y. Yang, S. Lu, L. Li, and X. Song, Comprehensiveevaluation of coal-fired power plants based on grey relationalanalysis and analytic hierarchy process, Energy Policy, 39(5),2011, 2343–2351.
  8. [8] P. Dehghanian, M. Fotuhi-Firuzabad, S. Bagheri-Shouraki,A.A. Razi Kazemi, P. Dehghanian, M. Fotuhi-Firuzabad, S.Bagheri-Shouraki, and A.A. Razi Kazemi, Critical componentidentification in reliability centered asset management of powerdistribution systems via fuzzy AHP, IEEE Systems Journal,6(4), 2012, 593–602.
  9. [9] R. Rietz and S. Suryanarayanan, A review of the applicationof analytic hierarchy process to the planning and operationof electric power microgrids, 40th North American PowerSymposium, NAPS’08, Calgary, Canada, 28–30 Sept. 2008.
  10. [10] A. Birolini, Reliability engineering; theory and practice (Berlin,Heidelberg: Springer, 2010).
  11. [11] T. Aven, Reliability and risk analysis (Netherlands: Springer,1992).
  12. [12] M. Lazzaroni, L. Cristaldi, L. Peretto, P. Rinaldi, and M. Cate-lani, Reliability engineering: basic concepts and applications,in ICT (Berlin, Heidelberg: Springer, 2011).
  13. [13] Y.A. Mahmood, A. Ahmadi, A.K. Verma, A. Srividya, andU. Kumar, Fuzzy fault tree analysis: A review of conceptand application, International Journal of Systems AssuranceEngineering and Management, 4, 2013, 19–32.
  14. [14] G.M. Mocko and R. Paasch, Incorporating uncertainty in diag-nostic analysis of mechanical systems, Journal of MechanicalDesign, 127, 2005, 315.
  15. [15] IEEE Std 762, IEEE standard definitions for use in reportingelectric generating unit reliability, availability, and productiv-ity, IEEE Std 762-2006 (revision of IEEE Std 762-1987), 2007,C1-66.
  16. [16] Y.A. Mahmood, A. Ahmadi, A.K. Verma, R. Karim, and U.Kumar, Availability and reliability performance analysis oftraction frequency converters – A case study, InternationalReview of Electrical Engineering (IREE), 8, 2013, 1231–1242.
  17. [17] T. L. Saaty, The analytical hierarchy process (New York:McGraw-Hill, 1980).
  18. [18] A. Ahmadi, S. Gupta, R. Karim, and U. Kumar, Selection ofmaintenance strategy for aircraft systems using multi-criteriadecision making methodologies, International Journal of Reli-ability, Quality and Safety Engineering, 17(03), 2010, 223–243.
  19. [19] T.L. Saaty, Decision making with the analytic hierarchy pro-cess, International Journal of Services Sciences, 1(1), 2008,83–98.
  20. [20] A. ¨Ozda˘go˘glu and G. ¨Ozda˘go˘glu, Comparison of AHP andfuzzy AHP for the multi-criteria decision making processeswith linguistic evaluations, Istanbul Ticaret ¨Universitesi FenBilimleri Dergisi, 6(11), 2007, 65–85.
  21. [21] F. Zahedi, The analytic hierarchy process—A survey of themethod and its applications, Interfaces, 16(4), 1986, 96–108.
  22. [22] G. Locatelli and M. Mancini, A framework for the selectionof the right nuclear power plant, International Journal ofProduction Research, 50(17), 2012, 4753–4766.
  23. [23] L. Abrahamsson, Railway power supply models and methodsfor long-term investment analysis, Licentiate Thesis, KTH,Stockholm, 2008.
  24. [24] Y.A. Mahmood, R. Karim, and M. Aljumaili, Assessment ofreliability data for traction frequency converters using IEEE Std762 – A study at Swedish railway, The 2nd Intern. Workshopand Congr. on Maintenance, Lule˚a, Sweden, December 2012,171.
  25. [25] G.M. Curley, Power plant performance indices in newmarket environment: IEEE Standard 762 Working Groupactivities and gads database, Power Engineering SocietyGeneral Meeting, IEEE, Montreal, Que, 2006, pp. 5–xx.DOI: 10.1109/PES.2006.1709544.
  26. [26] M. ˇCepin, Reliability and performance indicators of powerplants, in Assessment of power system reliability, methods andapplications (London: Springer-Verlag, 2011), 197–214.171

Important Links:

Go Back